BC Hydro - Campbell River Operations Facility

Crown Corporations
Industrial
Office

A new centre for BC Hydro in Campbell River. This mixed-use building contains both offices and industrial spaces with expansive yard storage. The site is located in a light industrial office complex developed by the local First Nations. The project was designed to permit a doubling of size to allow for an increase to the program to accommodate the John Hart Generating Station administration function when the generation site is redeveloped over the next few years.

The building is registered with the Canada Green Building Council and is a candidate for LEED Platinum certification.

  • Client
    BC Hydro
  • Services
    Omicron Integrated Project Delivery
    Architecture
    Construction Management
    Engineering
    Interior Design
  • Location
    Campbell River, BC
  • Year
    2015
    Ongoing
  • Size
    30,000 sq.ft.
  • Project Lead
    Korey Roberts, Kevin Hanvey